Homepage | Set Home | Add to Favorites
Member

Bochi Corporation


Products
  • No Category
Search
 

Friends links
  • No link

Autopilot with Marine System, Fluxgate Heading Sensor
Click image to view full size image
Product: Views:165Autopilot with Marine System, Fluxgate Heading Sensor 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-09-07 10:30
  Inquiry
Details
Model Number: BMMNCMAS001 Brand Name: BOCHI Key Specifications/Special Features: Main features:Fluxgate heading sensor with high accuracy and stabilityAutomatic correction for local magnetic varation4.5 silver bright LCD displayOff course alarm warns when vessel is not responding to autopilot control
  • Navigate with designed route of GPS Navigator
  • Timer can be used as an adjustable watch alarm
  • Gyro compass input with Gyro converter unit
  • Functions:
    • Auto mode:
      • Change course by panel dial knob
      • Change course by fix or handheld remote (optional)
    • Standby mode
    • GPS Navigation mode
    • Follow UP mode
  • Other details:
    • Steering systemHydraulic or electro-mechanical
    • Heading sensor:
    • Fluxgate heading sensor (standard)
    • Gyro compass thru gyro converter (optional)
  • Nav sensor:
    • GPS navigator: NMEA0183, APA, APB (baud rate: 4800)
    • Heading input: NMEA0183, HDT, HDG or HDM (baud rate: 4800)
  • Adjusttheparameters: weather, rudder and counter rudder from control menu, trim, rudder ratio and rudder limit from function menu
  • Alarm:
    • Off course alarm : 1 ~ 180 degree adjustable
    • Watch alarm : 1 ~ 60 adjustable watch alarm. Will trigger external alarm if not reset within 60 sec
    • NMEA data alarm : trigger when lost of NMEA data from GPS navigator in GPS
  • Power supply: 12V or 24V DC, standby 0.4A, auto mode 1.0A for control unit only
  • Equipment list:
    • KAP-866 control unit
    • Rudder feedback unit KRF-36
    • Fluxgate heading sensor KFG-25
    • Standard accessories
    • Standard installation kit
    • Operator manual
  • Shipping Information:
    • FOB Port: Shanghai
    • Lead Time: 3 - 10 days
    Main Export Markets:
    • North America
    • Asia
    • Australasia
    • Central/South America
    • Eastern Europe
    • Mid East/Africa
    • Western Europe
    Inquiry